

Main Function and Feature
▶ Automatic control by PLC, all parameters can be adjusted.
▶ Filling and capping process can be finished in this machine at one time.
▶ With CO2 pressurization and vacuumization function
▶ Adopt isobar filling method and with unique pressure maintaining system,performance stable and reliable, beer loss minimum.
▶ With pressure compensator, to guarantee a stable filling process.
| Bottle filling/capping machine | 330ml | 650ml | Up to 2L |
| 4-head | 200 bottles/H | 100-150 bottles/H | / |
| 6-head | 300 bottles/H | 200-250 bottles/H | / |
| 8-head | 400 bottles/H | 300-350 bottles/H | / |
| 10-head | 500 bottles/H | 400-450 bottles/H | / |
How long is the delivery time of your product?
The lead time for complete project is 45 working days, timed from final drawing confirmed
How long is the delivery time of your fermenter?
Usually the lead time for fermenter tank is 30 working days, while the lead time for complete brewery project is 40 working days, timed from final drawing confirmed
What is your payment term?
1. T/T transfer, 40% advance payment for start production, after paying 60% balance payment for shipping. 2. Paypal or trade assurance is available.
Shandong Zeren Machinery Equipment Co., Ltd. is an equipment manufacturer focusing on biological fermentation industry
Copyright © Shandong Zeren Machinery Equipment Co., Ltd. All Rights Reserved |
Sitemap
| Technical Support:
Semi-automatic 6-6 Glass Bottle Filling Machine
Semi-automatic 2-in-1 Glass Bottle Filling Machine
4-head Glass Bottle Washing Machine
Fully Automatic 4-4-1 Glass Bottle Filling Machine
24-head Glass Bottle Washing Machine
Fully Automatic 14-12-1 Glass Bottle Filling Machine
Fully Automatic 6-6-1 Glass Bottle Filling Machine
Manual Glass Bottle Filling Machine
Semi-automatic 6-1 Glass Bottle Filling Machine
Semi-automatic 4-4 Glass Bottle Filling Machine