Main Function and Feature
▶ Automatic control by PLC, all parameters can be adjusted.
▶ All use pneumatic double acting Angle seat valve which could ensure the action sensitivity and reliability
▶ Adopt isobar filling method and with unique pressure maintaining system,performance stable and reliable, beer loss minimum.
▶ With pressure compensator, to guarantee a stable filling process.
| Can filling/capping machine | 330ml | 650ml | Up to 2L |
| 4-head | 300 bottles/H | 200-250 bottles/H | / |
| 6-head | 400 bottles/H | 300-350 bottles/H | / |
| 8-head | 500 bottles/H | 400-450 bottles/H | / |
| 10-head | 600 bottles/H | 500-550 bottles/H | / |
How long is the delivery time of your product?
The lead time for complete project is 45 working days, timed from final drawing confirmed
How long is the delivery time of your fermenter?
Usually the lead time for fermenter tank is 30 working days, while the lead time for complete brewery project is 40 working days, timed from final drawing confirmed
What is your payment term?
1. T/T transfer, 40% advance payment for start production, after paying 60% balance payment for shipping. 2. Paypal or trade assurance is available.
Shandong Zeren Machinery Equipment Co., Ltd. is an equipment manufacturer focusing on biological fermentation industry